Date | Text | |
---|---|---|
13 Jul 1887
New Tay Bridge opened |
New Tay Bridge opened In 1887, the second Tay Rail Bridge was opened in Scotland, and remains in use today. Building was started in 1881 to replace the original single-track railway which had collapsed in a disaster on 28 Dec 1879 due to poor design and construction. The new bridge was designed for a double-track railway by William Henry Barlow and William Arrol on new, stronger piers within 60-ft (18-m) of the first. The stumps of the old piers remain as a breakwater. Many of the undamaged original girders together with new steelwork were incorporated into the new structure with a greater width to improve its lateral stability. On 18 Aug 1966, the Tay Road Bridge was opened by the Queen Mother to finally replace the ferry crossing of the Firth of Tay. |